Pre-Flight Claude Skill: Think Before You Build
AI Playbook Undeniable Speaking Trainings About Blog Subscribe Work With Me
CLAUDE SKILL · THINK

Point The Car Before You Hit The Gas.

Before you start any new project, build, database, or workflow, your Claude runs a five-question pre-flight brief, names what you might not be seeing, and waits for you to confirm before you build.

← All Claude Skills
01 / GET THE SKILL

Copy This. Give It To Your Claude.

You get excited and you start building. The problem shows up 90 days later, baked into a schema you cannot change. Pre-flight puts five questions between the idea and the build, and your Claude answers them for you from what it already knows about your business. Copy the two blocks below and give them to your Claude.

Step 1. Copy the skill block below.

Step 2. Open Claude and paste this instruction first, then paste the block underneath it:

Paste into Claude first
Turn the block below into a Claude skill and install it. Create the skill file exactly as written. Then personalize it with smart defaults from what you know about me: my business, my priorities, and how I work. Confirm when it is installed and tell me how to run it.
The Skill · give this to Claude
---
name: pre-flight
description: Run a structured pre-flight checklist before starting any new project, build, Claude Project, database, system, or workflow. Use this skill whenever I say "pre-flight," "run pre-flight," "before we build," "new project," "let's start a new project," "I want to build," "I'm creating a new project," "run the questions," "run the checklist," or any variation of wanting to think before building. Also trigger when I mention creating a new Claude Project, Notion database, content system, automation workflow, or any infrastructure that is meant to last beyond a single session. If I jump straight into building something new without running pre-flight, gently suggest running it first. This is the steering wheel before the gas pedal.
---

# Pre-Flight Check — Build From The Right Position

Run a structured pre-flight checklist before starting any new project, build, system, database, or workflow. You answer the questions on my behalf, surfacing what you see so I get visibility before I commit.

The principle: Excitement is fuel. Questions are the steering wheel. You run the checklist so I see what I might not.

## When to Use This

Any time I am about to start something new that is meant to last. This includes:

- A new Claude Project
- A new Notion database or system
- A new automation workflow (n8n, Zapier, etc.)
- A new content system or extraction pipeline
- A new client delivery system
- A new website section, landing page, or product
- A new skill file
- Any build session where the output is supposed to be used repeatedly

If I am doing a quick one-off task (writing a caption, drafting an email, brainstorming), skip this. Pre-flight is for things that are meant to persist.

## Trigger Phrases

- "pre-flight"
- "run pre-flight"
- "before we build"
- "new project"
- "let's start a new project"
- "I want to build [something]"
- "I'm creating a new [project/database/system]"
- "run the questions"
- "run the checklist"

## The Pre-Flight Protocol

### Step 1: Gather Context

Before answering the checklist, pull from every available source:

- **Memory and preferences** — what you already know about my business, stack, priorities, working patterns, and current builds
- **Conversation history** — anything discussed in this session or referenced from past sessions
- **My operating context, wherever I keep it** — if you can reach my notes, docs, or knowledge base, pull the latest operational data
- **My build tracker, if I keep one** — if it is accessible, check for related active builds that this project connects to or depends on

Do not ask me to provide context you already have. The whole point is that you see what I might not.

### Step 2: Answer The 5 Pre-Flight Questions

You answer all five questions yourself based on what you know. Present the completed checklist as a structured brief. Be specific, not generic. Every answer should reference real details about my business, stack, current priorities, or known constraints.

Present it exactly like this:

---

**PRE-FLIGHT BRIEF: [Name of what I'm building]**

Here's what I see before we build. Review this, correct anything that's off, and add what I'm missing.

**1. What this is actually supposed to do 90 days from now**
[Your answer. Be specific about what sustained usage looks like given my business model, team, and workflows. Name what success means in concrete terms, not abstract outcomes. A demo and a system look identical on day one. They look completely different on day 90.]

**2. Where the data lives, who owns it, and what happens if the tool changes**
[Your answer. Name the specific platforms, databases, and dependencies involved. Flag any platform risk, export limitations, or ownership gaps. Reference my known stack.]

**3. The invisible attack on this build**
[Your answer. Name 2-3 specific risks that could break this over time. These should not be generic risks. They should be specific to this build, my patterns, my stack, and my stage of business. Think about what I tend to overlook based on past builds and known working habits.]

**4. Who this is being built for — personal use, team use, or product**
[Your answer. State the intended audience and flag any architecture implications. If the answer changes the build approach, say so directly. Building for myself and accidentally building it like a product wastes weeks. Building for sale on personal infrastructure creates problems that can't be undone.]

**5. Decisions being made here that can't easily be reversed**
[Your answer. Name the specific irreversible or hard-to-reverse decisions in this build. Schema design, platform choice, authentication architecture, naming conventions that propagate, permissions structures. If everything is reversible, say so.]

---

### Step 3: Surface The Blind Spots

After the five answers, add a separate section:

**WHAT YOU MIGHT NOT BE SEEING**

This is your version of the Master Question: "What do you not know that you don't know?" List 2-4 things I likely haven't considered. These can be:

- Dependencies on other active builds
- Timing conflicts with current priorities
- Scope creep signals in the request
- Missing prerequisites
- Capacity constraints given my working window and current commitments
- Integration points that aren't obvious yet

Be direct. Name the thing. Don't hedge.

### Step 4: Confirm or Correct

After presenting the completed brief, say:

> **What needs correcting? What am I missing? Once you confirm, we build.**

Wait for me to review. I may:
- Confirm everything and say go
- Correct specific answers
- Add context that changes the picture
- Ask you to dig deeper on one area

If I correct or add, update your understanding and confirm the revised scope before building.

### Step 5: Log the Pre-Flight (Optional)

If I keep a build tracker and you can reach it, offer to log this as a new entry with the pre-flight brief captured in the description and next-action fields.

If I say no or the tracker isn't accessible, move on. Don't hold up the build for logging.

### Step 6: Build

Now build. The pre-flight is complete. Proceed with the actual project with full clarity on what you're building, why, and what to watch out for.

## Voice and Tone

- Direct. No fluff.
- Treat me as a CEO, not a student.
- Answer with confidence and specificity, not hedged generalities.
- If you don't have enough information to answer a question well, say exactly what you're missing and ask for that specific piece, not the whole question.
- Keep the energy forward-moving. This is not a blocker. This is a launchpad.

## Key Principles

- The most expensive mistake in the agentic era is building fast without asking the right questions first.
- The second most expensive mistake is asking the right questions and making the human do all the answering when you already have the context.
- Pre-flight is you showing me what you see. My job is to confirm, correct, and add. Not to start from scratch every time.
- This is what Human First, AI Enabled looks like in practice.

Installed In Under A Minute

Claude reads the block, builds the skill file, and installs it. From then on, you just run the skill in any conversation. No folders to find, no code to write.

Undeniable Studio

Build Your Personalized AI First Business Together

Every week you see what's working, build it live, and put it to work in your business.

Join The Studio →
02 / WHAT COMES BACK

Run It. Get The Result.

Here's the shape of what this skill hands you when it runs. Copy it, use it, keep moving.

Example Output
Building
A client onboarding system in Notion
Q1 · 90 Days Out
Every new client flows through one intake, one welcome sequence, and one status board with zero manual setup per client.
Q2 · Data + Ownership
Client records live in Notion. Export is CSV only, so a platform change means rebuilding relations by hand. Own the raw data elsewhere too.
Q3 · Invisible Attack
You build it for your current 4 clients and it breaks at 40. Manual tags rot. The welcome sequence has no owner when you are traveling.
Q4 · Built For
Team use. That means shared permissions and naming conventions from day one, so it holds up as the team grows.
Q5 · Hard To Reverse
The database schema and the status field names. Everything downstream references them, so pick them once and pick them well.
What You Might Miss
This depends on your CRM staying the source of truth. Building it this week collides with your launch. Confirm before we build.
Keep Stacking PRE-FLIGHT pairs well with THE ON-RAMP SKILL
03 / WHY IT WORKS

The Simple Idea Underneath It

You don't need to hold any of this in your head. That's the skill's job. If you're curious what it's doing for you, here's the idea underneath it.

The Simple Idea

Excitement is the gas pedal. Questions are the steering wheel. Most builds go sideways because someone hit the gas before anyone checked where the car was pointed. Pre-flight puts your hands on the wheel for five questions, and your Claude answers them for you from everything it already knows. You confirm, you correct, then you build.

1

AI Answers, You Confirm

Your Claude fills in all five questions itself from your business, your stack, and your priorities. Your job is to confirm, correct, and add, so you start from a real draft and refine it.

2

The 5 Pre-Flight Questions

What this does 90 days out. Where the data lives and who owns it. The invisible attack on the build. Who it is really for. What decisions cannot be reversed. Five questions that catch the expensive mistakes early.

3

What You Might Not Be Seeing

The Master Question made concrete. Your Claude names two to four blind spots you likely missed: dependencies, timing conflicts, scope creep, missing prerequisites. It names each one directly and plainly.

4

Steering Wheel, Then Gas Pedal

Pre-flight runs up front, before a single decision gets baked in. Five minutes of clarity here saves weeks of building the wrong thing on infrastructure you cannot undo.

QUESTIONS

What People Ask About PRE-FLIGHT.

They are the five questions worth answering before you build anything meant to last. What this is actually supposed to do 90 days from now. Where the data lives, who owns it, and what happens if the tool changes. The invisible attack that could break it over time. Who it is being built for, personal use, team use, or product. And which decisions being made here cannot easily be reversed. Your Claude answers all five for you, then you confirm or correct.

Starting to build treats every new project like a demo. A pre-flight brief treats it like a system. Your Claude pulls from everything it knows about your business and stack, fills in the five questions itself, and hands you a structured brief before a single thing gets built. You get to see the 90-day picture, the platform risks, and the irreversible decisions while they are still cheap to change.

It is the Master Question made practical: what do you not know that you don't know. After answering the five questions, your Claude names two to four blind spots you likely have not considered. Dependencies on other builds, timing conflicts with current priorities, scope creep signals, missing prerequisites, and capacity limits. It names each one directly so every blind spot becomes a decision you get to make on purpose.